• Home
  • Our National Practice
    • Subrogation and Property
    • Casualty Claims
    • Freight Loss and Damage
    • Freight Collections
    • Demurrage Collections
    • Contract Litigation
    • Bankruptcy Litigation
    • Contract Drafting/Review
    • Vendor Disputes
    • Maritime - Bridge Damage
    • Carrier Agency Litigation
  • Case Studies
    • Grade Crossing Accident
    • Scour / Excavation Damage
    • Barge Allision w/ Bridge
    • Defective Piston Pins
    • Defective Door Hinges
    • HVAC Maintenance Contract
    • Hurricane Damage
    • Environmental Remediation
  • Our Attorneys
    • Jeffrey D. Cohen
    • Timothy L. Frey
    • -
    • John S. Brubaker
    • Nicholas J. Stevens
    • Matthew J. Tinnelly
    • Benjamin H. Vaughan
  • More
    • Home
    • Our National Practice
      • Subrogation and Property
      • Casualty Claims
      • Freight Loss and Damage
      • Freight Collections
      • Demurrage Collections
      • Contract Litigation
      • Bankruptcy Litigation
      • Contract Drafting/Review
      • Vendor Disputes
      • Maritime - Bridge Damage
      • Carrier Agency Litigation
    • Case Studies
      • Grade Crossing Accident
      • Scour / Excavation Damage
      • Barge Allision w/ Bridge
      • Defective Piston Pins
      • Defective Door Hinges
      • HVAC Maintenance Contract
      • Hurricane Damage
      • Environmental Remediation
    • Our Attorneys
      • Jeffrey D. Cohen
      • Timothy L. Frey
      • -
      • John S. Brubaker
      • Nicholas J. Stevens
      • Matthew J. Tinnelly
      • Benjamin H. Vaughan
  • Home
  • Our National Practice
    • Subrogation and Property
    • Casualty Claims
    • Freight Loss and Damage
    • Freight Collections
    • Demurrage Collections
    • Contract Litigation
    • Bankruptcy Litigation
    • Contract Drafting/Review
    • Vendor Disputes
    • Maritime - Bridge Damage
    • Carrier Agency Litigation
  • Case Studies
    • Grade Crossing Accident
    • Scour / Excavation Damage
    • Barge Allision w/ Bridge
    • Defective Piston Pins
    • Defective Door Hinges
    • HVAC Maintenance Contract
    • Hurricane Damage
    • Environmental Remediation
  • Our Attorneys
    • Jeffrey D. Cohen
    • Timothy L. Frey
    • -
    • John S. Brubaker
    • Nicholas J. Stevens
    • Matthew J. Tinnelly
    • Benjamin H. Vaughan

Large Loss, Subrogation, and Property Damage Recovery

We have decades of experience recovering large loss damages on behalf of our clients. As a result, we are prepared to handle initial incident response, identification and preservation of evidence, and identify the most effective way to present claims for maximum recovery. We are adept at building the liability case without losing focus on building the damages case.  And we build our cases to go the distance at trial. 


We handle recovery matters in a wide variety of areas, including: 


  • Fire and Explosion Incidents 
  • Construction Defects & Worksite Safety 
  • Water Main Breaks 
  • Retention Basin Failures 
  • Landslides 
  • Flooding 
  • Third Party Recovery for Liabilities Imposed Upon Common Carriers 
  • Inland Marine Incidents Involve Barge/Vessel Collisions and Allisions and Damage to Bridges, Protection Cells, and Piers 
  • Maritime Valuation of Vessels and Tow 
  • Derailments 
  • Crossing Accidents 
  • Hydrodynamics and Hydrology – Scour Evaluation and Hydraulic Modeling 
  • Environmental Contamination 
  • Mechanical Damages 
  • Damage to Infrastructure 
  • Freight Loading and Securement (AAR Rules Compliance) 
  • Environmental Emergency Response and Remediation 
  • Other Complex Negligence and Product Liability  


Copyright © 2021  Cohen & Frey P.C. - All Rights Reserved.


Powered by